top of page

PHASE TWO - Operational

Phase One was to provide a respectable entry to the 2025 Georgetown Wooden Boat Show. Phase Two to include (in no particular order): Trailer upgrade chains replace tires register Below waterline flip boat patch with epoxy fiberglass paint flip back Outboard (Lark) get running controls Register Boat bilge pump safety gear register Seats (Phase Three?) Windshield (Phase Three?)

Drop Me a Line, Let Me Know What You Think

© 2035 by Train of Thoughts. Powered and secured by Wix

bottom of page