top of page
Search

PHASE TWO - Operational

  • Oct 21, 2025
  • 1 min read

Phase One was to provide a respectable entry to the 2025 Georgetown Wooden Boat Show.


Phase Two to include (in no particular order):

  • Trailer

    upgrade chains

    replace tires

    register

  • Below waterline

    flip boat

    patch with epoxy

    fiberglass

    paint

    flip back

  • Outboard (Lark)

    get running

    controls

    Register

  • Boat

    bilge pump

    safety gear

    register

  • Seats (Phase Three?)

  • Windshield (Phase Three?)

 
 
 

Comments


Drop Me a Line, Let Me Know What You Think

© 2035 by Train of Thoughts. Powered and secured by Wix

bottom of page