top of page
Search

PHASE TWO - Operational

  • Oct 21, 2025
  • 1 min read

Updated: 7 hours ago

Phase One was to provide a respectable entry to the 2025 Georgetown Wooden Boat Show.


The objectives for Boat Show Phase Two:


STEERING

Luckily only the steering cable needs to be replaced. Before photo;


FIBERGLASS LOWER HULL

More on this under a separate blog entry


OUTBOARD

More on this under a separate blog entry


ELECTRICAL

Only stern / bow lights had been installed. Required updates

  • Replace existing wiring & light switch

  • Test / replace existing bulbs

  • Add starting / house battery

  • Add fuse box

  • Add bilge pump & switch

  • Add horn & switch


SEATS

More on this under a separate blog entry.


MISCELLANEOUS

  • Register boat / motor / trailer

  • Safety gear fire extinguisher, throwable PFD, & flares


TRAILER

More on this under a separate blog entry.


WINDSHIELD (probably 2027)

 
 
 

Recent Posts

See All
XVIII. Georgetown Wooden Boat Show - 2026

This is the todo list from 2025 to get ready for the “really big show”. Note: each of these topics has a separate blog post. DONE - Repair / fiberglass below the waterline Restore / recover boat seats

 
 
 

Comments


Drop Me a Line, Let Me Know What You Think

© 2035 by Train of Thoughts. Powered and secured by Wix

bottom of page